View Single Post
  #1  
Old 26th September 2012
Sepultura1's Avatar
Sepultura1 Sepultura1 is offline
Ceriwis Addicted
 
Join Date: Sep 2012
Posts: 4,040
Rep Power: 18
Sepultura1 mempunyai hidup yang Normal
Default Kill studio ( recording, mixing, mastering ) bandung

Kondisi Barang : Baru

Harga :



Lokasi Seller : Jawa Barat


Description :



KILL STUDIO

RECORDING, MIXING, MASTERING








[/spoiler]
Spoiler for open this:
Spoiler for open this:
for PIC STUDIO:





Spoiler for open this:
Spoiler for open this:
for take room:





























Spoiler for open this:
Spoiler for open this:
for control room:

























Spoiler for open this:
Spoiler for open this:
for STUDIO GEARS:






1. CONVERTER :

LYNX AURORA 16 VT



2. PREAMP :

FOCUSRITE ISA prepack 428

TOFT AUDIO DESIGN atc2

SPL GOLDMIKE mark2

STUDIO PROJECT 828



3. AMPLIFIER:

MARSHAL JCM 900 HEAD CABINET

AMPEG B2-RE CLASSIC HEAD CABINET



4. DRUMS & CYMBAL :

DW COLECTOR

ERIC SINGER 14" (snare)

LARS ULRICH_METALICA 14" (SNARE)

OMAR HAKEEM 13" (SNARE)

ZILDJIAN A, SABIAN AA-HH, IRON COBRA



5. GUITAR INTRUMENT:

BREEDLOVE ACOUSTIC GUITAR



6. MICROPHONE

AKG D112

AKG C 4000

AKG C1000S

AKG DRUM SET MICROPHONE

NEWMAN TLM102

SINHEISER E604

SHURE SM57












Spoiler for open this:
Spoiler for open this:
for CLIENT KAMI:






PETERPAN

JAVAJIVE

TAHTA

7 KURCACI

ROCKET ROCKERS

KAPTEN

RIKA ROESLAN project

NANO

ARIAN

NAFF

ALONE AT LAST

BESIDE

ROSEMARY

OUTRIGHT

CLOSEHEAD

HIGH & MANY MOREE...












Spoiler for open this:
Spoiler for open this:
for JASA KAMI:






RECORDING

EDITING

MIXING

MASTERING

**disediakan mess bagi klient luar kota










Spoiler for open this:
Spoiler for open this:
for HARGA:






RECORDING 1 SHIFT (5 JAM)

shift 1 : 09.00 - 14.00 = rp 350.000/shift

shift 2 : 14.00 - 19.00 = rp 350.000/shift

shift 3 : 19.00 - 24.00 = rp 400.000/shift

shift 4 : 24.00 - 05.00 = rp 500.000/shift



OVERTIME : Rp 100.000/ jam

EDITING : Rp 150.000/ instrument

MIXING : Rp 700.000/shift (5jam)

MASTERING : Rp 3.500.000/album














Spoiler for open this:
Spoiler for open this:
for PAKET PROMO:




paket promo bulan november, desember, januari..

paket recording album maximal 10 lagu

periode 2 minggu, 2 shift/ hari

belum termasuk editing, mixing, mastering

harga Rp 8juta

dp 25%, minggu 1 bayar 50%, minggu 2 pelunasan










[spoiler=open this] for CP:
















Reply With Quote