![]() Located in southern France, Structural statistics * 17 December 2004 : Opening of bridge to traffic (15 December 2004 : Inauguration) * 22,650,000 vehicles have used the Viaduct de Millau in its first five years of service. * 10 October 2001 : Construction work started * 343 m : Height at top of pylons * 280 m / 919 ft: Height of roadway over the Tarn * 2,460 m / 155 miles: Total length of roadway * 8 spans resting on 7 piers o span widths: 204 m between abutments and first and last piers o 342 m spans between remaining piers * 2230 tonnes : Weight of each of the 16 sections of road-deck. Each section is built up from 60 tonne deck-units, each 4 m wide by 17 m long. The deck-units are built in Eiffel�s factories at Lauterbourg and os-sur-Mer. * Heights of the 7 piers : P1 : 94,50 m P2 : 244,96 m P3 : 221,05 m P4 : 144,21 m P5 : 136,42 m P6 : 111,94 m P7 : 77,56 m ![]() ![]() ![]() Kalau ada yang mau kesana ajak2 yah... ![]() |